Site Logo

At work, we’ve just finished packing up and are moving to a new location on Monday. I went for a brief tour of the new facilities this morning, and it looked pretty good. The cubicles are smaller than what we have right now, but still the place looks awesome. It’s one huge floor, combining people from 3 places, so it’ll take quite some getting used to. I’ve got 3 PC’s to setup, so hopefully I can maximize the space available. We’ll see what happens on Monday.
A funny thing about it though, is that all the servers are going to be put in a high-security room, which requires a CPIC 3 clearance. Why is this funny? Well, most of the people who regularly need access to the servers only have CPIC 2, meaning nobody can get in to change the backup tapes :) (yes, we’re still using tape drives, not SAN‘s). Add the fact that most of the time, physical access to certain servers are needed, I foresee a reduction from a CPIC 3 to a CPIC 2 for access to that room :)
Powered By Qumana

Average Rating: 4.9 out of 5 based on 194 user reviews.

No comments yet. Be the first.

Leave a reply